Transporting packages up to 18 m

AVTTRANS has completed the delivery of packages for Cam Ranh airport project. The 62 packages, including the 06 passenger bridges with length up to 18m each, were transported by vessel to Lotus port then trucking to Cam Ranh by 8 axle lines trailer.

#24-28/12/2017

#Lotus-Camranh airport

01 02 03 04